DCC HIGHCLIFF ROAD, SANDYMOUNT REALIGNMENT

The project scope consisted of the slip repair and realignment of 50m of road over a slip on the Dunedin Peninsula. The scope items of relevance to the DCC pavement rehabilitation contract included slip remediation design and drawings (Geosolve), geometric design of the road realignment, pavement design and production of construction drawings and specification.

Bonisch Improved the geometry and safety of the existing curve to client requirements, Designed and constructed within extremely tight time frame to meet client and customer expectations. Highcliff Road was reopened to traffic on the advertised date.

The design work was carried out as a part of Bonisch’s overall commission to project manage the coordinated closure of Highcliff Road and repair of 3 major slips on the route with associated improvements within a very short time frame.

Constructed in August / September 2017 – construction cost of approximately $300k

Article: https://www.odt.co.nz/news/dunedin/new-barrier-cre...